top of page
Vernal Utah Horrocks Location
Horrocks Color Bar

UINTAH BASIN (VERNAL) OFFICE

Pattern-background-4.png
Vernal Utah Horrocks Location
UINTAH BASIN (VERNAL) OFFICE LOCATION

2028 West 500 North

Vernal, UT 84078

Our Vernal office has been providing engineering solutions to the Uintah Basin since 1996, originally starting under the ESI name. Our staff understands the unique challenges of the region, helping us meet the various objectives of our projects. 

UINTAH BASIN (VERNAL) PROJECTS

BALLARD 1.0-MG WATER TANK

Design of a 1.0-MG buried, pre- stressed D115 style water storage tank 
ballard_1-mg_water_tank.jpg
zions_block.jpg

ZION'S BLOCK

Designed improvements for downtown Vernal while mitigating challenges such as designing a waterline replacement that included working around utilities in tight spaces allowing the old line to remain in-place 

UDOT 1500 EAST 

RAILROAD CROSSING

Project included safety improvements at two rail crossings which consisted of improving sight-line, grades, and adding signals, lights, and gates 
udot_1500E_railroad_crossing.jpg
ashley_valley_8-MGD_water_treatment_plant.jpg

ASHLEY VALLEY 8-MGD WATER TREATMENT PLANT

Designed and provided construction management of the water treatment facility which sits at the mouth of Ashley Gorge 
bottom of page